Brick Paver Installation & Edging



Staging of material

The majority of paver jobs will vary depending on gain access to, site conditions, task size and obviously, the weather condition. These circumstances can have a total effect on your task from a timing stand point. Cautious consideration ought to be taken to figure out the time to start the paver installation. Constantly try to prevent any traffic or minimize on the ready locations.

The foreman or job supervisor ought to constantly have the materials (sand/ pavers) dispersed around the job website for effective and easy setups. Paver pallets/bundles need to be put in a way not to interfere with the paver installation. The appropriate pallet/bundle placement can make the actual task installation easier and quicker by minimizing the total labor of handling the product.

Brick paver patterns

Pavers can be positioned in various patterns depending upon their shape. Each paver shape will generally have a number of various hatch patterns that are provided by the producer.

Contractors require to take into factor to consider the traffic weight loads on their paver projects. In many applications around the world, it has actually been shown that pavers laid in a herringbone pattern have performed sufficiently.

Pavers that are 60 mm (2 - 3/8 in) density are suitable for pedestrian applications. Pavers that are going to be used in industrial or commercial applications must be 80 mm (3 - 1/8 in) in density.

Reference/starting point for brick paver installation

There are a variety of conditions that determine the starting point of a paver job.

When beginning to set up pavers it is best to snap a real straight chalk line on the surface of the bedding sand or pull a true straight string line above the surface area of the bedding sand at the finished elevation of the pavers This will help as a guide for preserving straight joint lines and will likewise permit the installer to make adjustments in the alignment of the pavers.

Buildings and concrete suppressing are normally not straight and need to not be used for establishing straight joint lines. The use of string lines is essential to identify the true straightness of the edge. As the paver installation advances, the string lines will assist decrease the requirement for small trim pieces.

These will keep a minimum joint width and permit the bed linen and jointing sand to enter between each paver. Pavers with spacer bars are generally not laid in snug against each other because a string line will offer consistent joint spacing.

Installation of brick pavers.

One of the most extensively utilized approaches for the installation of pavers is hand installation of each paver. It is best to set up a single row of pavers along one of the real straight lines that you have actually pulled or above the bed linen sand. The best technique is to put a paver against another one and let it slide down into the bedding sand.

When installing pavers on a high grade, they need to be set up at the base of the grade going uphill. This will avoid the pavers from sneaking as they are being laid.

The best method for setting up pavers on big jobs is to install them mechanically. There are a couple items a contractor should consider prior to setting up pavers mechanically:

1.) Mechanical installers are just capable of installing pavers in certain patterns.

2.) The specialist needs to ensure that the producer is capable of manufacturing and bundling pavers in the wanted pattern on the pallets for simple mechanical installation.

3.) Professionals may experience a color mixing circumstance coming off the bundles of pavers Poor color blending might lead to an irregular looking installation. Many producers are consistent with color mixing on each package of pavers, however it is the professional's responsibility to ensure correct mixing in the field.

Cutting procedures for brick pavers.

Professionals typically have 2 ways of cutting pavers. When cutting pavers wet, it will assist reduce dust and will lengthen the diamond blades life. The operator of the brick saw must always cut the pavers away from the surface area of the paver field when cutting wet, due to the fact that the pavers will develop a slurry that will stain the paver surface.

The brick saw operator must always use the appropriate protection that is required for operating a saw, such as eye, ear, breathing and hand security ).

Edging types

Edge restraints play a major function in the overall success of an interlocking pavement installation Edging restraints remove lateral movement of the pavers and hold the pavers tightly together. Particularly at the outer border of the paver application, without an edging restraint, your job is ensured to stop working over time.

There are numerous different edging restraints from which specialists can select. Typically produced edge restraints are the most commonly utilized by professionals. Made edging restraints can range from, plastic edging, steel and aluminum, timbers or precast concrete and stone. An edging type that is utilized primarily in business and industrial applications is poured-in-place concrete curbs. This edging restraint is usually installed by other specialists.

Edging installation.

When installing your edge restraint, it must rest directly on top of the compressed gravel base. The compacted gravel base course must extend a minimum of 6in beyond the perimeter of the pavers This will offer a correct foundation upon Paver Installation Boca Raton which the edging restraint can sit. Made edging (i.E. Plastic, steel or aluminum) ought to be strongly anchored into the compacted gravel base( talk to the manufacturer's literature for the suggested spacing of the spikes). There are some edging restraints that will extend deeper into the gravel base or beyond the base course (i.E. Timbers or poured-in-place curbs ). Edging restraints ought to never ever be placed straight on top of the bedding sand. This might lead to the migration of the bedding sand and ultimate lateral movement of the pavers. If there is a possibility of losing bed linen sand in between the pavers and the edge restraint, then geo textile fabric is advised. When a space in between the pavers and the edging exceeds 3/8" (10mm), then the area ought to be filled with cut pavers. All edging applications need to be properly back filled after they are set up to assist provide extra stability.

Compaction of brick pavers.

After installation, the pavers need to be compacted. The whole area that is to be compacted must be swept tidy of any foreign objects and particles that can trigger scratching or scuffing on the surface of the pavers.

It is very important to have a compactor that can apply between 3000lbs. And 5000 pounds. Of centrifugal compaction force. In addition, it is necessary that the first compaction occurs prior to any jointing sand has actually been applied to the pavers. This can trigger a bridging problem and will not permit the joints to be completely filled with jointing sand if jointing sand is applied to the pavers prior to compaction takes location. This can also prevent the pavers from being correctly set into the bed linen sand.

When compacting the pavers, it is suggested that you make a minimum of 2 passes in different directions across the pavers. This will enable the pavers to be effectively embeded in the bedding sand and will force the bedding sand up into the joints from the bottom of the pavers.

The compaction of the pavers is extremely important to the last performance of the pavers. Failure to do proper compaction can result in contortions and pavement failure gradually.


Paver pallets/bundles need to be placed in a manner not to interfere with the paver installation. One of the most commonly utilized methods for the installation of pavers is hand installation of each paver. The operator of the brick saw should always cut the pavers away from the surface of the paver field when cutting damp, due to the reality that the pavers will develop a slurry that will stain the paver surface area. Edging restraints eliminate lateral movement of the pavers and hold the pavers tightly together. When a gap between the pavers and the edging surpasses 3/8" (10mm), then the area needs to be filled with cut pavers.